A bathroom is the one room where shortcuts show up years later as a stain on the ceiling below. I've been remodeling bathrooms in Monmouth County since 2004: hall baths, primary baths, and tub-to-shower conversions, with real waterproofing behind the tile, ventilation that goes outside, and permits pulled. Owner-led, no salespeople.
Based in Tinton Falls. Registered NJ home improvement contractor, HIC #13VH04440200. Five stars on Houzz.
Every bathroom I've been called in to fix failed behind the tile, not in front of it. So this is where I spend the effort, and where I won't cut corners to hit a price.
Every job here is a Monmouth County house. Same standards underneath, different looks on top.
I come out, measure, and listen. You get a written proposal that spells out the scope, the allowances for tile and fixtures, and the schedule. No "we'll figure it out as we go" line items.
Materials are ordered and on site before demo. Plumbing and electrical rough-in, inspection, waterproofing and flood test, tile, fixtures, glass. The work area is sealed and cleaned up every day.
Final inspection, a walkthrough with you, and a punch list we close together. You get the permit paperwork for your records, and my number for anything that comes up later.
These are working ranges for a full remodel done properly, with permits, by a registered contractor. Your number depends on the size of the room, whether plumbing moves, and what you pick out. I'll give you a firm written price after a site visit, not a guess over the phone.
| Project | Typical range | What moves the number |
|---|---|---|
| Hall bath, full remodelGut to studs, same layout, new tub or shower | $25,000 – $45,000 | Tile selection, tub versus tiled shower, glass, whether the subfloor needs work |
| Tub-to-shower conversionWalk-in shower in the tub's footprint | $18,000 – $32,000 | Curbless entry, custom glass, niche and bench, tile size |
| Primary bath, full remodelLarger room, often a layout change | $45,000 – $90,000+ | Moving plumbing, freestanding tub, double vanity, heated floor, stone |
A quote well under these ranges usually means no permit, no membrane, or a subcontractor you'll never meet. Ask what's behind the tile before you compare numbers.
"My bathroom remodel went smoother than I would have ever dreamed and they were done ahead of schedule. Now I have a gorgeous new bathroom to enjoy. They are trustworthy, reliable and super hard workers."
Heather T.Bathroom remodel"Rob is a great person who is always professional and took the time to tell us our options in each situation. These were not easy jobs, but instead our house is more efficient and more like the sanctuary a home should be."
Victoria Z.Kitchen and bathroomThe shop is in Tinton Falls, so Colts Neck, Red Bank, Fair Haven, Little Silver, Shrewsbury, Oceanport, and Rumson are around the corner. The rest of the county is a short drive.
A hall bath is usually three to five weeks on site once materials are in hand. A primary bath with a layout change runs longer. The honest variable is lead time on tile, vanities, and glass, so I order everything before demo starts and give you a schedule you can plan around.
Yes. Plumbing and electrical work in a bathroom needs permits and inspections in every Monmouth County town, and I handle them. A contractor who skips permits is saving himself time, not saving you money.
Almost always. If it's your only bathroom we talk through it up front and plan the sequence so you're without a toilet for the shortest possible stretch, usually a day or two. The work area is sealed off and cleaned up daily.
Yes, and they're one of the most common jobs I do. A walk-in shower with a proper curb or a curbless entry, a glass panel or door, and a niche for the shampoo. Most take about three weeks.
Both. You bring the look you want and I bring what will actually work in the space: where the plumbing can move, what the layout allows, which materials hold up in a wet room. I'll tell you when a choice will cause a problem before you buy it.
My crew, the same people job after job, with licensed plumbers and electricians for their trades. I plan the work, set the schedule, check it at every stage, and I'm the one you call. There's no salesperson and no project manager between you and the person responsible.
Which bathroom, what's wrong with it, and what you'd like it to be. I reply within one business day and we set up a time for me to come measure.